Glaubach Daughters Trust Et al Design Review (P4232)- County of Marin

Community Development Agency

Summary

Main Component of the Project

Residential Addition/Accessory Structure

Location

89 Vista Del Sol, Mill Valley
Assessor's Parcel 043-420-15

Status

Approved

Project Planner

Erin Yattaw
415-473-3535

Applicant

Pete Pedersen
415-456-2070

Project Description

The applicant requests Design Review approval to construct a pool with an integrated retaining wall, a spa with integrated retaining walls, and a retaining wall exceeding six feet in height on a developed lot in Mill Valley. The proposed development would not result in an increase of the floor area ratio of 21 percent on the 16,208 square foot lot. Height and setback information for the proposed development is listed below.

The proposed pool with integrated retaining walls would reach a maximum height of 6 feet above surrounding grade and the exterior would have the following setbacks: over 75 feet from the southern front property line; 18 feet from the western side property line; 81.5 feet from the eastern side property line; and 27 feet from the northern rear property line.

The proposed spa with integrated retaining walls would reach a maximum height of 6 feet above surrounding grade and the exterior would have the following setbacks: over 75 feet from the southern front property line; 40.5 feet from the western side property line; 73.5 feet from the eastern side property line; and 31 feet from the northern rear property line.

The proposed retaining wall exceeding six feet in height would reach a maximum height of 6.5 feet above surrounding grade and the walls would have the following setbacks: over 90 feet from the southern front property line; 74 feet from the western side property line; 45 feet from the eastern side property line; and 20 feet from the northern rear property line.

Zoning:  RMP-2 (Residential Multiple-Family Planned)
Countywide Plan Designation: MF2 (Low Density Residential)
Community Plan: Strawberry

Most Recent Project Plans

Glaubach Daughters Revised Plans 1.31.24

Administrative Decisions

View the Administrative Decision - Default comments for Administrative Decisions

Design Review Board Meetings

TitleDateLocationDocuments
Strawberry Design Review Board12/4/23
7:00 PM
Strawberry Design Review Board03/18/24
7:00 PM