contractor iconThe Contractor is responsible for submitting a cement limit or embodied carbon compliance form to the inspector for final inspection on the day of or within six weeks of the poured concrete. The form must be accompanied by batch receipts as provided by the ready-mix supplier.

Choose one of the following compliance pathways and download form to complete:

  1. Cement Limit Pathway: Contractor Low Carbon Concrete Cement Compliance Form
  2. Embodied Carbon Pathway: Contractor Low Carbon Concrete EC Compliance Form